Position : Home > Products > Air compressor > Diesel portable screw air compressor

Portable screw air compressor MW050-7

Brand Name: D miningwell
Certification: CE, ISO
Minimum Order Quantity: 1 set
Packaging Details: 40HQ-20GP
Delivery Time: 15-20 days
Payment Terms: L/C, T/T, Western Union

This Diesel Screw Air Compressor Portable Compressor is especially developed for mine drilling rig , High reliablity,Easy operation and maintenance,Good power balance,Easy to transport.
Share:
Product Introduction
This Diesel Screw Air Compressor Portable Compressor is especially developed for mine drilling rig , High reliablity,Easy operation and maintenance,Good power balance,Easy to transport.
It is very applicated for road construction ,concrete breaking , sand blasting...
Technical data
Model MW050-7 MW120-7 MW100-10 MW100-14
Air pressure(bar) 7 7 10 14
F.A.D(m³/min) 5 12 10 10
Engine power(Kw) 33 96 96 96
Max. speed of revolution(rpm) 2950 2300 2300 2300
Dimension(mm) 1940*1200*1240 2350*1300*1550 2350*1300*1550 2350*1300*1550
Weight(kg) 650 1470 1470 1470
Related cases
Oct 09, 2024

"Zhejiang Miningwell Supply Chain Management Co., Ltd. shines at Hangzhou Machinery Exhibition"

A machinery exhibition with the theme of "Machinery and Technology" was held in Hangzhou, Zhejiang from September 25 to 27, 2024, and Zhejiang Mining Supply Chain Management Co., Ltd. became the highlight of the exhibition. Its booth at the exhibition attracted a lot of attention. The mechanical products displayed were integrated with scientific and technological achievements. From drilling equipment to power transmission devices, the company's technical strength was fully demonstrated. The professional team explained the products in detail. In addition, the company also communicates and interacts with all parties through various forms to enhance its visibility and lay the foundation for cooperation. This exhibition demonstrates its strength and delivers innovative development signals, which is expected to promote industry progress.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.