Position : Home > Products > Rock drilling rig > Integrated DTH drilling rig

MWYX452 Integrated DTH Drill Rig

Brand Name: D miningwell
Minimum Order Quantity: 1 set
Packaging Details: 40HQ-20GP
Delivery Time: 15-20 days
Payment Terms: L/C, T/T, Western Union

MWYX-452 Integrated DTH Drill Rig is powered by Yuchai YC6A260L-T301 and is equipped with a 16/17 screw air compressor. Can meet 90-130mm aperture.
Share:
Product Introduction
1. Using its single power to drive the screw air compressor and drilling rig hydraulic system at the same time, compared with the separated DTH drilling rig, the comprehensive fuel consumption and energy saving are 35%, and the maintenance cost is reduced by 50%;

2. The core hydraulic components are imported from Europe. The reliable hydraulic system greatly reduces the workload of system maintenance and is convenient and practical;

3. Powerful two-speed hydraulic traveling mechanism, strong off-road capability, and large torque swing motor can easily deal with drill stuck;

4. The two-stage dry dust collection device is environmentally friendly and helps improve production efficiency; the integrated technology solves the problems of moving and long-distance management of air compressors in engineering and mining.
Show details
Technical data
General Specification
Power Yuchai YC6A260L 191kW
Hole Depth 20 m
Drill Pipe Sizes Φ 76x3000 mm
Hole Dia Φ110-138 mm
DTH Hammer 4"
Rotation Torque(Max.) 2500 N.m
Rotation Speed 0 - 100 rpm
Tramming Speed(Max.) 3 km/h (High Speed) 2 km/h (Low Speed)
Gradient 23°
Track Frame Oscilation ±14°
Weight 9500 kg
Dimension 7567 x 2500 x 2900 mm
Dry Dust Collector Standard
Dual Speed Walking Motor Standard
Matching Air Compressor
Working Pressure 1.7 Mpa
F.A.D 16 m3/min
Related cases
Oct 09, 2024

"Zhejiang Miningwell Supply Chain Management Co., Ltd. shines at Hangzhou Machinery Exhibition"

A machinery exhibition with the theme of "Machinery and Technology" was held in Hangzhou, Zhejiang from September 25 to 27, 2024, and Zhejiang Mining Supply Chain Management Co., Ltd. became the highlight of the exhibition. Its booth at the exhibition attracted a lot of attention. The mechanical products displayed were integrated with scientific and technological achievements. From drilling equipment to power transmission devices, the company's technical strength was fully demonstrated. The professional team explained the products in detail. In addition, the company also communicates and interacts with all parties through various forms to enhance its visibility and lay the foundation for cooperation. This exhibition demonstrates its strength and delivers innovative development signals, which is expected to promote industry progress.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.