Position : Home > Products > Rock drilling rig > Top hammer drilling rig

Top hammer drilling rig G7

Brand Name: D miningwell
Minimum Order Quantity: 1 set
Packaging Details: 40HQ-20GP
Delivery Time: 15-20 days
Payment Terms: L/C, T/T, Western Union

High-power hydraulic rock drill, with large impact energy, comes with anti-strike function, which reduces the risk of stuck drilling and saves more drilling tools.
Share:
Product Introduction
1. High-power hydraulic rock drill, with large impact energy, comes with anti-strike function, which reduces the risk of stuck drilling and saves more drilling tools.
2. The core components are all internationally renowned brands with good reliability.
3. Accurate matching of rock drill-air compressor-engine, economic mode / strong operation mode dual working conditions, wide adaptability to rock formations, low operating cost.
4. The whole machine has compact structure, small and flexible, fast walking speed and strong off-road ability.
5. Folding drilling rig is adopted, which has a wide drilling coverage area, adapts to multi-angle hole drilling, and the hole location is quick and efficient.
Show details
Technical data
Technical Parameters 
  G5 G7
Hole range 45 - 90 mm 76 - 115 mm
Rod size T38/T45 T51
Max. depth 25m 25 m
Drilling coverage area 17 m2 17 m2
Engine Cummins Cummins
Engine power 134 kW/2200 r/min 194 kW/2200 r/min
Drafter Atlas Copco RD14S / 14 kW Atlas Copco RD18S / 18 kW
Impact pressure 14.5 bar 20.0 bar
Advance itinerary 3500mm 3500mm
Propelling beam length 6030mm 6030mm
Advance compensation 1400 mm 1400 mm
Max. advancing speed 0.9 m/s 0.9 m/s
Max. thrust 20 kN 20 kN
Walking speed 1.5/3.1 km/h 1.5/3.1 km/h
Gradeability 20° 20°
Dimensions (L x W x H) 10800x2350x3000 mm 11610x2450x3200 mm
Weight 13500kg 14500kg
Related cases
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Oct 09, 2024

"Zhejiang Miningwell Supply Chain Management Co., Ltd. shines at Hangzhou Machinery Exhibition"

A machinery exhibition with the theme of "Machinery and Technology" was held in Hangzhou, Zhejiang from September 25 to 27, 2024, and Zhejiang Mining Supply Chain Management Co., Ltd. became the highlight of the exhibition. Its booth at the exhibition attracted a lot of attention. The mechanical products displayed were integrated with scientific and technological achievements. From drilling equipment to power transmission devices, the company's technical strength was fully demonstrated. The professional team explained the products in detail. In addition, the company also communicates and interacts with all parties through various forms to enhance its visibility and lay the foundation for cooperation. This exhibition demonstrates its strength and delivers innovative development signals, which is expected to promote industry progress.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.