Position : Home > Products > Water well drilling rig > Mud-pump

Mud pump BW160

BW160 Mud Pump is widely used in railway, hydraulic engineering, metallurgical engineering, building construction, geological exploration, engineering exploration (within 1000 meters of the drilling depth)etc.
Share:
Product Introduction
BW mud pump is a horizontal three cylinder reciprocating single acting piston pump, the pump with two cylinder and four file variable. The big cylinder for supporting the 1000 meters of large diameter drill. The small cylinder for supporting the1500 meters of small diameter drill. Mainly used for the core drilling mud pump, can also be used for other aspects of mine grouting, drainage and long distance water supply and other purposes.
Show details
Technical data
Technical Parameters
Type BW160-10
Horizontal three cylinder reciprocating
single acting piston pump
Cylinder dia.(mm) 70
Stroke(mm) 70
Pump Speed(times/min) 200 132 83 55
Flow(L/min) 160 107 67 44
Pressure(Mpa) 2.5 4 6.5 10
Power(Kw) 11
Dimension(mm) 1450*745*970
Weight(kg) 430
Related cases
Oct 22, 2024

Successful Water Well Drilling in Zimbabwe with MW600

The DMiningwell MW600 water well drilling rig is a powerful and efficient solution for creating water wells in Zimbabwe. Designed to meet the challenges of different terrains, this crawler rig has sturdy construction and mobility to access remote locations. Equipped with state-of-the-art technology, it ensures accurate drilling and high productivity. The drilling planning process is carefully crafted by experts who consider factors like soil conditions and water table levels. Once the optimal site is selected, the MW600's powerful drilling mechanism can penetrate various soil and rock types to reach clean and abundant water sources. During drilling, strict quality control measures are in place, operated by highly skilled technicians. The end result is a high-quality water well for domestic, agricultural, or industrial use. It has proven to be an invaluable asset in Zimbabwe, addressing the water needs of local communities. Keywords: water well drilling rig, water well, Crawler water well drilling rig, Drilling planning.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.