Position : Home > Products > Water well drilling rig > Crawler water well drilling rig

Crawler water well drilling rig MW800

Brand Name: D miningwell
Certification: CE, ISO
Minimum Order Quantity: 1 set
Packaging Details: 40HQ-20GP
Delivery Time: 15-20 days
Payment Terms: L/C, T/T, Western Union

MW800 is a high efficiency and multi-functional down the hole water well drilling equipment, It can be used to drill water well, agricultural irrigation well, geothermal well and other type well holes. It is special suitable for mountain area and rock stratum water sourcing project.
Share:
Product Introduction
MW800 type water well drilling rig is a light weight, efficient and multifunctional drilling equipment, it is mainly applicable to industrial and civil drilling, geothermal drilling, has the advantages of compact structure, fast advancing, mobile and flexible wide application region etc., It is especially suitable for water intake in mountainous and rocky strata.

The rig can create drilling jobs in different strata, borehole diameter can up to 140-400mm. The rig with hydraulic technology, supporting high torque hydraulic motor rotation and large bore hydraulic cylinder push, the multi cylinder engine of famous factory provides power for the hydraulic system, two stage air filter, air compressor intake design, prolong the service life of diesel engine. Special pump set design is convenient for maintenance and reduce the cost of maintenance. Centralized control of the hydraulic control table, convenient operation.

This series of drill rig adopts a excavator crawler chassis and has strong off-road performance. The independent module design allows the drill to be mounted on the truck to increase its mobility. Two speeds of rotating and advancing speed can meet the different needs of soil and rock drilling. Combined positioner, the positioning disc can be adjusted and replaced according to different types of drill pipe and DTH hammer, so as to ensure the accuracy and reliability of the positioning and centering. The hoisting mechanism is convenient for hoisting of drill pipe and DTH hammer, so as to reduce the labor intensity.
Show details
Technical data
Technical Parameters
The weight(T)  13 Drill pipe diameter(mm) φ102 φ108 φ114φ117
The hole diameter(mm) 140-400 Drill pipe length(m)  1.5/ 2.0/ 3.0/ 6.0
Drilling depth(m)  800 Rig lifting force(T)  36
One-time advance length(m)  6.6 Rapid rise speed(m/min)  20
Walking speed(km/h)  2.5 Fast feeding speed(m/min) 40
Climbing angles(Max.)  30 Width of loading(m)  2.95
Equipped capacitor(kw) 194 Hoisting force of winch(T)  2
Using air pressure(MPA)  1.7-3.5 Swing torque(N.m) 9000-14000
Air consumption(m³/min)  17-42 Dimension(mm)  6300*2300*2950
Swing speed(rpm)  45-140 Equipped with hammer  Medium and high wind pressure series
The penetration efficiency(m/h)  15-35 High leg stroke(m) 1.7
 The engine brand  Cummins engine
Related cases
Oct 22, 2024

Successful Water Well Drilling in Zimbabwe with MW600

The DMiningwell MW600 water well drilling rig is a powerful and efficient solution for creating water wells in Zimbabwe. Designed to meet the challenges of different terrains, this crawler rig has sturdy construction and mobility to access remote locations. Equipped with state-of-the-art technology, it ensures accurate drilling and high productivity. The drilling planning process is carefully crafted by experts who consider factors like soil conditions and water table levels. Once the optimal site is selected, the MW600's powerful drilling mechanism can penetrate various soil and rock types to reach clean and abundant water sources. During drilling, strict quality control measures are in place, operated by highly skilled technicians. The end result is a high-quality water well for domestic, agricultural, or industrial use. It has proven to be an invaluable asset in Zimbabwe, addressing the water needs of local communities. Keywords: water well drilling rig, water well, Crawler water well drilling rig, Drilling planning.
View More +
Aug 29, 2024

Vietnam Chulai Port Expansion (cofferdam) Construction Phase II -- Successful Test Pile

The cofferdam project is a large-aperture pile hole construction plan. 1000mm and 1200mm diameter casings need to be inserted into the rock formation for 5-6 meters, the total depth of the pile holes is 25-30 meters, 300 piles with a diameter of 1200mm, and 280 piles with a diameter of 1000mm. This solution is expected to allow the port to obtain a load capacity of 500,000 tons, thereby increasing the throughput of the Chulai port.
On January 31, the project’s first casing pipe pile test pile was successful. Under the condition of rock hardness of 100-150Mpa, 6 meters into the rock was completed within 4 hours, laying a solid foundation for the second phase expansion of Chulai Port.
View More +
Inquiry
Email
WhatsApp
Tel
Back
SEND A MESSAGE
You are mail address will not be published.Required fields are marked.